Your Results
Eligible for net metering?
Average units per year
Average Monthly
Bill [INR]
₹
KW System required
KW System recommended
Net System Cost
after Subsidy
if any INR
₹
Size Required (Sq F)
Shadow Freearea required
Size Required (Sq M)
Estimated
generation annually
[KWH]
Your Contribution
to the Environment
Max % from Solar
Max % Load Connection
Max Transformer Capacity (%)
Maximum allowed units that can be generated from solar annually
PLF estimate (%) (based on state)
Average per day generation from 1 KW system
Electricity Generated from recommended system
Subsidy (%)
AD
Net Cash Outflow
Bill and Savings Per Year
Profit and Loss Statement
Year |
---|
Consumption from Grid without Solar (kWh) |
Degradation |
Generation from Solar (kWh) |
Requirement from Grid (kWh) |
Bill per year without Solar (INR) |
Bill per year with Solar (INR) |
O&M Expenses & Inverter Replacement |
Savings per year (INR) |
System Cost (INR) |
Net Cash Outflow (INR) |
Calculation Information1
IIn some states there is a minimum installation (for example, in West Bengal it is 5 KW) required to avail net metering. The Solar Calculator excludes those cases.
Disclaimer
The information which you calculate from this Calculator is intended for use by you as a guide only, it is not an offer and has no legal effect on any contracts entered into by you "the client". This simulation and the resulting calculations do not constitute accurate result of solar generation and the financial gain it shows. Please do consult a solar rooftop installation provider prior to relying on the results.