Signed a Power Purchase Agreement (PPA) for 4.5 lakh solar units/month (effective Oct 2024).
70% of renewable energy target in the phase 1 of the new projects
ENERGY EFFICIENCY ENHANCEMENTS
System-level upgrades (e.g., chiller optimisation, nano fluid use, intelligent compressed air systems, Compressor drain condensate water oil filtration unit installed in FAB 3) led to significant energy savings.
Focused on reducing idle energy consumption and optimising utility systems.
WATER STEWARDSHIP
Achieved 16% reduction in specific water consumption.
Approx 2,471 KL of recycled and reused water with STPs operating 24/7 across facilities.
Focus on circular water use for non-process applications.
WASTE MANAGEMENT
Around 4762 MT landfill waste diverted to safe disposal.
Invested ₹81.79 lakhs (INR) in conservation initiatives.
Conducted Environmental Impact Assessments at new project sites.
BIODIVERSITY PROTECTION
Implemented ecological risk assessments and mitigation near operational sites.
Conducted plantation drives, including in the ecologically sensitive Sundarbans.
These initiatives are underpinned by a phased decarbonisation strategy, guided by science-based targets and SDGs targeting a 70% CO₂ reduction through energy-efficient systems (Phase 1), followed by deeper operational changes (Phase 2), and progressing toward net-zero readiness in the long term.